04 April 2013

00:30 Bug / Feature #4968 (Needs Work): ArchLinux PKGBUILD update
Automatically changed from new state after 3 days admin
00:00 Bug / Feature #4926: Shares not accepted / voting failed
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Task / Tâche #5003: piVote Sektion Wallis
Automatically enforce due date for Normal Priority to 30 days in the future admin
00:00 Task / Tâche #5002: piVote Sektion Wallis
Automatically enforce due date for Normal Priority to 30 days in the future admin

03 April 2013

23:52 Task / Tâche #5003 (Closed): piVote Sektion Wallis
Die Sektion Wallis hat die GL angeschrieben wegen einer eigenen PiVote gruppe
Kannst du das nötige in die Wege lei...
Atropos
23:52 Task / Tâche #5002 (Closed): piVote Sektion Wallis
Die Sektion Wallis hat die GL angeschrieben wegen einer eigenen PiVote gruppe
Kannst du das nötige in die Wege lei...
Atropos
00:00 Bug / Feature #2546: Makefile erstellen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

01 April 2013

10:36 Bug / Feature #4732 (Closed): Cursor Positionen, Fenstergrössen ect
Atropos
10:36 Bug / Feature #4732: Cursor Positionen, Fenstergrössen ect
Okay danke vielmals fürs überarbeiten und ich freu mich besonders aufs orangene Circle Atropos
00:25 Bug / Feature #4968: ArchLinux PKGBUILD update
Comment #2 updated. danilo
00:15 Bug / Feature #4968: ArchLinux PKGBUILD update
Leider blockiert durch #1255, die "neue" download-URL gibt einen HTTP 500. Zudem werden bei jedem Update der Pakete d... danilo
00:24 Bug / Feature #1255: Mirror für PiVote-Pakete
Das Archiv ist kaputt.... danilo
00:00 Bug / Feature #4926: Shares not accepted / voting failed
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

31 March 2013

17:30 Bug / Feature #4968: ArchLinux PKGBUILD update
Automatically enforce due date for Normal Priority to 30 days in the future admin
17:22 Bug / Feature #4968 (Needs Work): ArchLinux PKGBUILD update
Mit der alten Version des PKGBUILDs wurden die Sources nicht gefunden (wurden wahrscheinlich woanders hinkopiert). Al... shugyousha
00:00 Bug / Feature #2546: Makefile erstellen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

28 March 2013

00:20 Bug / Feature #4228: Create Certificate Dialog cuts Button in half
Automaticaclly enforce assigned-to to the author of the ticket admin
00:15 Bug / Feature #4228 (Done): Create Certificate Dialog cuts Button in half
Exception
00:14 Bug / Feature #1581 (Done): About Dialog
Exception
00:00 Bug / Feature #2546: Makefile erstellen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

27 March 2013

23:40 Bug / Feature #4732: Cursor Positionen, Fenstergrössen ect
Automaticaclly enforce assigned-to to the author of the ticket admin
23:33 Bug / Feature #4732 (Done): Cursor Positionen, Fenstergrössen ect
Der Rest lässt sich nicht mit vernünftigem Aufwand machen. Exception
23:00 Bug / Feature #1083: Lintian check failed on PiVote Debian x86 package version 1.0.9.0
Automaticaclly enforce assigned-to to the author of the ticket admin
22:51 Bug / Feature #1083 (Done): Lintian check failed on PiVote Debian x86 package version 1.0.9.0
Exception
14:02 Bug / Feature #1083: Lintian check failed on PiVote Debian x86 package version 1.0.9.0
To be checked for 1.4.0.0. Exception
21:00 Bug / Feature #1137: Datei-Archive in Ordner packen
Automaticaclly enforce assigned-to to the author of the ticket admin
20:54 Bug / Feature #1137 (Done): Datei-Archive in Ordner packen
Exception
14:03 Bug / Feature #1137: Datei-Archive in Ordner packen
To be updated for 1.4.0.0. Exception
14:10 Bug / Feature #1652: PiVote ugly and unreadable on Linux
Automaticaclly enforce assigned-to to the author of the ticket admin
14:00 Bug / Feature #1652 (Won't Do): PiVote ugly and unreadable on Linux
A new Gtk-Based version is planned. Exception
14:01 Bug / Feature #1581: About Dialog
To be finished. Exception
14:00 Bug / Feature #1102: Indication of previous vote
Automaticaclly enforce assigned-to to the author of the ticket admin
13:53 Bug / Feature #1102 (Won't Do): Indication of previous vote
Der alte Client wird nicht mehr weitergeführt. Exception
13:54 Bug / Feature #4271 (Won't Do): Client / Authority List / Text "Name" cut
Der alte Client wird nicht mehr weitergeführt. Exception

26 March 2013

23:37 Bug / Feature #4924 (Done): Floating tooltips
Exception

25 March 2013

20:58 Bug / Feature #4925 (Done): Date/Time check
Exception
12:37 Bug / Feature #4925 (Done): Date/Time check
Check date/time with server when starting client/circle. Exception
13:00 Bug / Feature #4641: IOException beim Löschen eines Zertifikates
Automaticaclly enforce assigned-to to the author of the ticket admin
12:53 Bug / Feature #4641 (Won't Do): IOException beim Löschen eines Zertifikates
Der alte Client soll ausgemustert werden. Exception
12:45 Bug / Feature #4270 (Done): Password char not showing (Ubuntu)
Exception
12:43 Bug / Feature #4732: Cursor Positionen, Fenstergrössen ect
* -Die Abstimmungserstelldialoge ect lassen sich die Fenster nicht maximieren.-
* -Die Schrift in Pivote ist unter L...
Exception
12:40 Bug / Feature #4926 (Done): Shares not accepted / voting failed
When the shares are not accepted, the voting should go to failed. Exception
12:36 Bug / Feature #4924 (Done): Floating tooltips
Remove floating toolstips and replace with reliable alternative Exception
00:00 Bug / Feature #2546: Makefile erstellen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1137: Datei-Archive in Ordner packen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

24 March 2013

00:00 Bug / Feature #4641: IOException beim Löschen eines Zertifikates
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

22 March 2013

00:00 Bug / Feature #2546: Makefile erstellen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1137: Datei-Archive in Ordner packen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

20 March 2013

15:50 Bug / Feature #4246 (Closed): Crash after closing
Automatically close after 30 days admin

19 March 2013

00:00 Bug / Feature #2546: Makefile erstellen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1137: Datei-Archive in Ordner packen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

17 March 2013

19:40 Bug / Feature #4690: PDF Generierung nach Zertifikatversand an Server
Automaticaclly enforce assigned-to to the author of the ticket admin
19:40 Bug / Feature #4566: Display Cert info
Automaticaclly enforce assigned-to to the author of the ticket admin

16 March 2013

00:00 Bug / Feature #2546: Makefile erstellen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1137: Datei-Archive in Ordner packen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

14 March 2013

15:03 Bug / Feature #3176: pivote-circle crasht bei Abstimmung
Gut, danke. danilo

13 March 2013

01:29 Bug / Feature #3176: pivote-circle crasht bei Abstimmung
Bessere Debug-Funktionen zur nächsten Version hinzugefügt. Exception
01:27 Bug / Feature #4690 (Won't Do): PDF Generierung nach Zertifikatversand an Server
Der alte Pi-Vote Client soll ausgemustert werden. Exception
01:25 Bug / Feature #4566 (Won't Do): Display Cert info
Der alte Pi-Vote client soll abgelöst werden. Exception
00:01 Bug / Feature #4566: Display Cert info
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
01:24 Bug / Feature #4270: Password char not showing (Ubuntu)
Testing with other font. Exception
00:00 Bug / Feature #2546: Makefile erstellen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1137: Datei-Archive in Ordner packen
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

10 March 2013

00:01 Bug / Feature #4566: Display Cert info
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

07 March 2013

00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

06 March 2013

23:30 Bug / Feature #4732 (Needs Work): Cursor Positionen, Fenstergrössen ect
Automatically changed from new state after 3 days admin

04 March 2013

00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

03 March 2013

23:20 Bug / Feature #4732: Cursor Positionen, Fenstergrössen ect
Automatically enforce due date for Normal Priority to 30 days in the future admin
23:18 Bug / Feature #4732 (Closed): Cursor Positionen, Fenstergrössen ect
Beim Aufsetzen des Pivote sind heute ein paar unschöne Dinge aufgefallen.
* Die Abstimmungserstelldialoge ect lasse...
Atropos

02 March 2013

16:40 Bug / Feature #4690 (Needs Work): PDF Generierung nach Zertifikatversand an Server
Automatically changed from new state after 3 days admin

01 March 2013

00:01 Bug / Feature #4271: Client / Authority List / Text "Name" cut
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:01 Bug / Feature #4270: Password char not showing (Ubuntu)
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:01 Bug / Feature #4228: Create Certificate Dialog cuts Button in half
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1857: SOCKS-Support
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1652: PiVote ugly and unreadable on Linux
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1581: About Dialog
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1102: Indication of previous vote
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1083: Lintian check failed on PiVote Debian x86 package version 1.0.9.0
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

27 February 2013

16:30 Bug / Feature #4690: PDF Generierung nach Zertifikatversand an Server
Assign unassigined ticket to project leader admin
16:20 Bug / Feature #4690: PDF Generierung nach Zertifikatversand an Server
Automatically enforce due date for Normal Priority to 30 days in the future admin
16:13 Bug / Feature #4690 (Closed): PDF Generierung nach Zertifikatversand an Server
Nachdem ein Zertifikat zur Validierung an den Server gesandt wurde kann der Dialog "Persönliche Identifikation" zum g... christianseematter

26 February 2013

00:01 Bug / Feature #4271: Client / Authority List / Text "Name" cut
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:01 Bug / Feature #4270: Password char not showing (Ubuntu)
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:01 Bug / Feature #4228: Create Certificate Dialog cuts Button in half
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1857: SOCKS-Support
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1652: PiVote ugly and unreadable on Linux
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1581: About Dialog
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1102: Indication of previous vote
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1083: Lintian check failed on PiVote Debian x86 package version 1.0.9.0
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

24 February 2013

15:00 Bug / Feature #4641 (Needs Work): IOException beim Löschen eines Zertifikates
Automatically changed from new state after 3 days admin

23 February 2013

00:01 Bug / Feature #4271: Client / Authority List / Text "Name" cut
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:01 Bug / Feature #4270: Password char not showing (Ubuntu)
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:01 Bug / Feature #4228: Create Certificate Dialog cuts Button in half
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1857: SOCKS-Support
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1652: PiVote ugly and unreadable on Linux
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1581: About Dialog
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1102: Indication of previous vote
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1083: Lintian check failed on PiVote Debian x86 package version 1.0.9.0
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

22 February 2013

11:03 Bug / Feature #3176 (Needs Work): pivote-circle crasht bei Abstimmung
Wie in Kommentar 9 geschrieben:
OS: Arch Linux
Version: 1.3.1.0
Abstimmung: u.a. Asylgesetz und Raumplanungsgesetz
danilo

21 February 2013

22:01 Bug / Feature #3176 (Needs Feedback): pivote-circle crasht bei Abstimmung
Welches System inkl. Version verwendest du?
Werde bei Gelegenheit versuchen das nachzuvollziehen.
Exception
00:00 Bug / Feature #3176: pivote-circle crasht bei Abstimmung
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
14:50 Bug / Feature #4641: IOException beim Löschen eines Zertifikates
Assign unassigined ticket to project leader admin
14:40 Bug / Feature #4641: IOException beim Löschen eines Zertifikates
Automatically enforce due date for Normal Priority to 30 days in the future admin
14:33 Bug / Feature #4641: IOException beim Löschen eines Zertifikates
Scheinbar klappen die Attachements beim Erstellen des Tickets nicht.
Here you go.
christianseematter
14:32 Bug / Feature #4641 (Won't Do): IOException beim Löschen eines Zertifikates
Wenn ich via Kontextmenü ein Zertifikat entfernen will wird die IOException wie im dump gezeigt ausgelöst. christianseematter

20 February 2013

00:01 Bug / Feature #4271: Client / Authority List / Text "Name" cut
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:01 Bug / Feature #4270: Password char not showing (Ubuntu)
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:01 Bug / Feature #4228: Create Certificate Dialog cuts Button in half
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1857: SOCKS-Support
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1652: PiVote ugly and unreadable on Linux
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1581: About Dialog
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1102: Indication of previous vote
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1083: Lintian check failed on PiVote Debian x86 package version 1.0.9.0
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

18 February 2013

15:49 Bug / Feature #4246 (Won't Do): Crash after closing
in absprache mit Jos, der den Dump nicht mehr hat. Apophis
00:00 Bug / Feature #3176: pivote-circle crasht bei Abstimmung
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

17 February 2013

00:02 Bug / Feature #4271: Client / Authority List / Text "Name" cut
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:02 Bug / Feature #4270: Password char not showing (Ubuntu)
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:02 Bug / Feature #4228: Create Certificate Dialog cuts Button in half
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1857: SOCKS-Support
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1652: PiVote ugly and unreadable on Linux
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1581: About Dialog
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1102: Indication of previous vote
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1083: Lintian check failed on PiVote Debian x86 package version 1.0.9.0
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

16 February 2013

13:53 Bug / Feature #4246 (Needs Feedback): Crash after closing
Hast du den Dump noch?
Falls dump noch da
* dump anfügen, ticket auf needs work stellen und wieder an exception a...
Apophis
00:00 Bug / Feature #4246: Crash after closing
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
12:24 Bug / Feature #4566 (Needs Work): Display Cert info
Automatically changed from new state after 3 days admin
12:17 Bug / Feature #4272 (Closed): Untranslated strings
Automatically close after 30 days admin
12:07 Bug / Feature #4201 (Closed): App crash when entering date of birth
close after 30 days Apophis
12:07 Bug / Feature #4245 (Closed): Font und schreipfeeler
close after 30 days Apophis

15 February 2013

00:00 Bug / Feature #3176: pivote-circle crasht bei Abstimmung
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

14 February 2013

00:02 Bug / Feature #4271: Client / Authority List / Text "Name" cut
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:02 Bug / Feature #4270: Password char not showing (Ubuntu)
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:02 Bug / Feature #4228: Create Certificate Dialog cuts Button in half
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1857: SOCKS-Support
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1652: PiVote ugly and unreadable on Linux
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1581: About Dialog
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1102: Indication of previous vote
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1083: Lintian check failed on PiVote Debian x86 package version 1.0.9.0
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

13 February 2013

00:00 Bug / Feature #4246: Crash after closing
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

12 February 2013

00:00 Bug / Feature #3176: pivote-circle crasht bei Abstimmung
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

11 February 2013

00:02 Bug / Feature #4271: Client / Authority List / Text "Name" cut
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:02 Bug / Feature #4270: Password char not showing (Ubuntu)
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:02 Bug / Feature #4228: Create Certificate Dialog cuts Button in half
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1857: SOCKS-Support
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1652: PiVote ugly and unreadable on Linux
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1581: About Dialog
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1255: Mirror für PiVote-Pakete
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1102: Indication of previous vote
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
00:00 Bug / Feature #1083: Lintian check failed on PiVote Debian x86 package version 1.0.9.0
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

10 February 2013

00:00 Bug / Feature #4246: Crash after closing
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

09 February 2013

10:11 Bug / Feature #1988 (Closed): Wrong Exception-Message in "TSerializable Load<TSerializable>(string fileName)"
LukyLuke
00:00 Bug / Feature #3176: pivote-circle crasht bei Abstimmung
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

07 February 2013

12:40 Bug / Feature #4566: Display Cert info
Automatically enforce due date for Normal Priority to 30 days in the future admin
12:34 Bug / Feature #4566 (Closed): Display Cert info
at the certificate selection screen (see attached file) it would be useful to introduce multiple columns displaying i... Doekbrijder
00:00 Bug / Feature #4246: Crash after closing
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

06 February 2013

00:28 Bug / Feature #3176: pivote-circle crasht bei Abstimmung
Problem besteht auch bei der Raumplanungs-Abstimmung nach wie vor. Mit Circle der crash, mit wizard hats geklappt.
...
danilo
00:00 Bug / Feature #3176: pivote-circle crasht bei Abstimmung
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin

04 February 2013

00:00 Bug / Feature #4246: Crash after closing
Due date reached, automatically increased by 3 days. Please handle this ticket immedialty admin
 

Also available in: Atom